Work Management System -wms- Adnoc Pdf Apr 2026
- Maintenance Planner / Scheduler - Operations Authority - Maintenance Supervisor - Contractor / Vendor - CMMS Data Steward
- Weekly WMS review meetings - Root cause analysis for schedule breaks - Lessons learned from turnarounds
The ADNOC Work Management System (WMS) provides a standardized framework for the safe, efficient, and reliable execution of all maintenance and operational work across ADNOC Group’s assets. It integrates with the ADNOC Operational Excellence (OE) System and enforces rigorous Permit to Work (PTW) protocols to ensure zero harm, maximum asset integrity, and optimized lifecycle cost. work management system -wms- adnoc pdf
- A – Typical Work Order Coding Structure (ADNOC) - B – Priority Matrix (Safety, Production impact) - C – Job Safety Analysis (JSA) Template - D – Abbreviations and Definitions Sample Content (Page 1 – Executive Summary Style) 1. Introduction
This content is tailored to reflect the typical rigor, HSE focus, and asset management standards of ADNOC (Abu Dhabi National Oil Company). 1. Introduction 1.1 Purpose of the WMS 1.2 Scope (Upstream, Downstream, Refining, Petrochemicals) 1.3 Alignment with ADNOC’s Operational Excellence (OE) System - Maintenance Planner / Scheduler - Operations Authority
3.1 High-Level Process Flow 3.2 Interfaces with Other Systems (ERP, CMMS, Digital Twin)
| OE Pillar | WMS Contribution | |-----------|------------------| | HSE | PTW, risk assessment, SIMOPS, LOTO | | Asset Management | Preventive & predictive maintenance planning | | Continuous Improvement | Work feedback loop and KPI monitoring | | Competency | Role-based WMS training and assurance | Introduction This content is tailored to reflect the
**4.1 Work Identification** - Sources: Inspections, Operator rounds, Condition monitoring, Process deviations - Priority classification (Emergency, Urgent, Routine, Planned) - Task list creation - Resource estimation (Manpower, tools, materials) - Risk assessment (HAZID, JSA)
- Weekly and daily scheduling windows (ADNOC common practice) - Coordination with operations for system/plant availability - Integrated scheduling with Turnarounds (TA) & Shutdowns
- Technical report & as-maintained data - Feedback loop into maintenance strategy - KPIs data capture (Schedule compliance, backlog)